Wyoming Time

California time

When discussing the future of the oil and gas industry, it is important to consider the unscientific use of the propaganda term "pollutant" when referring to CO2 gas. While people often label CO2 as a "Greenhouse Gas", it's important to remember that CO2 is necessary for all plant life, and mammals exhale CO2 as a natural bodily function. Therefore, labeling CO2 as a pollutant is wrong. Can you say, "Essential Nutrient"?
Silence is the voice of complicity. = more Pangloss quotes
Big Oil and Gas 24

Big Oil

When looking at the future of the oil and gas industry, it is important to understand the term "pollutant" as it relates to carbon dioxide (CO2). CO2 is often labeled as a "greenhouse gas," but this can be misleading without proper context. CO2 is crucial for Earth's ecosystems; it is necessary for photosynthesis, the process by which plants turn carbon dioxide into oxygen. This process supports plant life, which in turn supports animal life, including humans. Can you say, "Essential Nutrient"? | Thus, describing CO2 simply as a pollutant overlooks its fundamental contributions to life on Earth. As we engage in discussions about environmental policies and regulations, particularly in regions like California, it is imperative to present these facts to government officials and policymakers. An informed dialogue that recognizes the importance of CO2 can lead to a more balanced understanding of its role in both natural processes and the broader context of climate science. Advocating for a nuanced perspective on CO2 is essential to avoid oversimplification and to promote responsible energy practices that ensure both environmental sustainability and economic viability.

About Me

My photo
United States
When looking at the future of the oil and gas industry, it is important to understand the term "pollutant" as it relates to carbon dioxide (CO2). CO2 is often labeled as a "greenhouse gas," but this can be misleading without proper context. CO2 is crucial for Earth's ecosystems; it is necessary for photosynthesis, the process by which plants turn carbon dioxide into oxygen. This process supports plant life, which in turn supports animal life, including humans. Can you say, "Essential Nutrient"?

Followers

Prices are good



Oil Patch 2024

Oil Patch 2024
Oil Patch 2024

Oil Patch Nov 13, 2024

Oil Patch Nov 13, 2024
Rig 88 Nov 13, 2024

Friday, November 22, 2024

2024 11 22 Profiles of Courage - Jordan Pierson (Derrick Hand)

2024 11 22 Profiles of Courage - Jordan Pierson (Derrick Hand)

This morning, Friday, November 22, 2024, 6:00 am MST, we are drilling at 13,650’ at an average P rate of 23 fph. Just making hole now! Anticipating hitting the Shannon 2 sand at 14,538’. On the Green Mountain Federal #4, that was the depth where we took that first big gas kick. This time we have an adequate mud weight to control the anticipated abnormal pressure.
 
Today’s video features Mr. Jordan Pierson, Derrick Hand for Rig 88. Jordan has been working on drilling rigs in the Rocky Mountain region for the past 14 years.
Derrick Hands are responsible for the upkeep and treatment of the mud system. In the video, Mr. Pierson regularly checks the viscosity and weight of the mud being pumped downhole (going in) and then likewise, checks the same properties of the mud coming out of the hole over the shale shakers. In the video, the viscosity is measured in seconds, the number of seconds it takes for 1 quart of mud to fill the cup. Jordan then weighs the mud on the scale, reading the weight in pounds per gallon, and then enters the readings into the system for permanent record. He spends most of his time talking and conferring with the driller and the mud engineer to ensure the mud system on the surface and downhole meets or exceeds company specifications. A good mud system is vital to the success of the drilling operations. It’s just like the blood in the human body. If your blood is in good shape, you will be in good shape. If your blood is in bad shape, all kinds of sickness and illness will occur. Derrick hands are also responsible for the maintenance and operation of the two large mud pumps that circulate the mud through the drill string. Mr. Pierson is very well-spoken and an encouragement to all those on his crew! Keep up the great work Jordan!
 
Enjoy!

 

2024 11 22   https://vimeo.com/1032378460/b39fd1ce45?share=copy

2024 11 22 Profiles of Courage - Jordan Pierson (Derrick Hand)

- - -


Thursday, November 21, 2024

2024 11 21 Mustangs near Location!

2024 11 21 Mustangs near Location!

This morning, Thursday, November 21, 2024, 6:00 am MST, we are still tripping for a new bit and BHA.
We are running back in the hole at 9,075’ after having to make another trip back out of the hole yesterday for a failed mud motor.
Did not make any new hole today. We are investigating the cause of a recent string of mud motor failures.
We should be back on bottom and drilling by mid-morning today.
 
Current plans are:
(1.)           Finish TIH with new bit and BHA
(2.)           Drill 6 1/8” hole to 15,600’ TVD (15,800’ MD)!!


2024 11 21 Mustangs near Location!



Today’s video features the namesake(s) of our prospect – the Wild Mustangs!
A few days ago, our videographer, Jacek Bogucki, caught a small group of mustangs near the road close to the rig.
No drilling rig or oilfield stuff in today’s video – just horses!
 
Enjoy!


Tuesday, November 19, 2024

2024 11 18 Profiles of Courage - Pat McCann (Floor Hand)

2024 11 18 Profiles of Courage - Pat McCann (Floor Hand)

This morning, Tuesday, November 19, 2024, 6:00 am MST, we are drilling 20 fph at 13,269’. Made 329’ yesterday. P Rates are starting to fall off indicating bit wear and/or mud motor failure.
Will most likely have to make a bit trip today.
 
Current plans are:
(1.) Drill 6 1/8” hole to 15,600’ TVD (15,800’ MD)!!
 
Today’s video features Mr. Pat McCann, Floor Hand for Rig 88. Pat has over 25 years of experience throughout the domestic US.
On each crew, there is a Driller, Assistant Driller, Derrick Hand, Motor Man and two Floor Hands. These guys literally perform all the manual labor on the rig.
They are the backbone of all drilling operations! Without them, nothing gets done!
They are constantly on the lookout for any kind of unsafe operations and then report the same to their Driller.
My hat is off to these guys for enduring the mud and cold, and somehow managing to keep a smile on their faces (at least most of the time…..).
In the video you can see Pat going thru his daily check list, checking all components of Rig 88 and performing normal maintenance.
You also get a good look at the BOP stack currently in use.
Here, Pat checks all of the hydraulic connections connected to the stack to make sure they are fully functional should we have a Well control situation.
 
Enjoy!

 

2024 11 19   https://vimeo.com/1030589843/9aa2f861df?share=copy

2024 11 18 Profiles of Courage - Pat McCann (Floor Hand)


Sunset as seen from up on Rig 88


 



Monday, November 18, 2024

2024 11 18 Rigging Up Annular Preventer - Duane Winkler (LSOG Wellsite Supervisor)

2024 11 18 Rigging Up Annular Preventer - Duane Winkler (LSOG Wellsite Supervisor)

 This morning, Monday, November 18, 2024, 6:00 am MST, we are drilling 40 fph at 12,940’. Made 270’ yesterday. Finished TIH with 6 1/8” bit and BHA.

Drilled out float joints and 10’ of new hole. Conducted a FIT (“Formation Integrity Test”) . Tested casing seat to 14.5 ppg. Currently drilling @ 12,940’!

 

Current plans are:

(1.) Drill 6 1/8” hole to 15,600’ TVD (15,800’ MD)!!

 

Today’s video features Mr. Duane Winkler, one of our Wellsite Supervisors, discussing the surface well control equipment currently being utilized on the Found Soldier Federal #1.

On numerous reports you see the acronym “BOP” or “BOPE”, which stands for Blowout Preventer.

This usually refers to the entire BOP stack, which will become more clear in the video.

 

Have also attached another still picture by Jacek entitled “Moonrise on Rig 88”.

 

Enjoy!

 

2024 11 18   https://vimeo.com/1030798279/6ab0fdf494?share=copy

2024 11 18 Rigging Up Annular Preventer - Duane Winkler (LSOG Wellsite Supervisor)


Sunday, November 17, 2024

2024 11 17 Profiles of Courage - Dakota Dellos (Motorman)

2024 11 17 Profiles of Courage - Dakota Dellos (Motorman)

 Hello Everyone!

 

This morning, Sunday, November 17, 2024, 6:00 am MST. Yesterday we finished NU (“Nipple Up”) the 10,000 psi BOP stack and successfully tested the same as per BLM regulations.

BLM representatives were on location to witness the tests. Make up 6 1/8” bit and BHA and start TIH.

 

Current plans are:

(1.) Finish TIH with 6 1/8” bit and BHA to12,625’

(2.) Drill out cement, float joint and 10’ of new hole,

(3.) Conduct FIT (“Formation Integrity Test”),

(4.) Drill 6 1/8” hole to 15,600’ TVD !!

 

Today’s video features Mr. Dakota Dellos, Motorman. On each crew there is a Driller, Assistant Driller, Derrick Hand, Motor Man and two Floor Hands.

As a Motorman, they are responsible for the maintenance and repairs for all the engines on the rig (…..and anything else that might go down and need to be repaired…..).

They are usually the ones who have worked around big engines for most of their career and understand how they work.

Dakota is always there, ready to jump in and lend a helping hand wherever needed!

Thank you, Dakota, for all your hard work and dedication!

 

Enjoy!

 

2024 11 17   https://vimeo.com/1030174908/dd737a3ade?share=copy

2024 11 17 Profiles of Courage - Dakota Dellos (Motorman)


Saturday, November 16, 2024

2024 11 16 Cementing 7” Intermediate Casing - Ben Hadden

2024 11 16 Cementing 7” Intermediate Casing - Ben Hadden

 Hello Everyone!

 

This morning, Saturday, November 16, 2024, 6:00 am MST; We have successfully cemented the 7” intermediate casing at 12,670’!

Currently, we are ND (“Nipple Down”) the 5,000 psi BOP stack and NU (“Nipple Up”) the 10,000 psi BOP stack.

When completed, we will test as per BLM regulations.

 

Current plans are:

(1.) Test as per BLM regulations,

(2.) TIH with 6 1/8” bit and BHA,

(3.) Drill out cement, float joint and 10’ of new hole,

(4.) Conduct FIT (“Formation Integrity Test”),

(5.) Drill 6 1/8” hole to 15,600’ TVD !!

 

We have two videos today. The first video features Mr. Ben Hadden, Wellsite supervisor, explaining the details of the cementing operations we performed last night.

The second video actually shows the drilling and completion of a vertical gas well.

If you watch closely, it shows what actually happens when you run casing and pump cement.

“A picture is worth a thousand words!”

 

Enjoy!

 

2024 11 16   https://vimeo.com/1030312858/1fc428bc80?share=copy

2024 11 16 Cementing 7” Intermediate Casing - Ben Hadden





 

2024 11 16   https://vimeo.com/1030347320/8a045ee350?share=copy

2024 11 16 Vertical Gas Well Drill and Complete

 


Friday, November 15, 2024

LSOG LLC

 Hello Everyone!

 

This morning, Friday, November 15, 2024, 6:00 am MST, we are at TD with the 7” intermediate casing at 12,670’, circulating and conditioning mud, and preparing to cement.

Yesterday, while RIH with the casing, we tagged a bridge at 8,050’ and could not go any deeper.  While attempting to work through the bridge, we lost ±400 Bbls of mud.

We spent 5 hours building the mud volume back up in the pits, then after regaining circulation with a special “pill” spotted on bottom, we finally worked through the bridge after

pounding on it with the casing for several hours. The 7” casing was then RIH to 12,670’ TD with full circulation regained. We definitely had a few tense moments yesterday!

Hitting bridges and having to work through them while running casings is nothing out of the ordinary. It kind’a goes with the territory. It happens all the time in the drilling business!

Thank you, Earl, Ben, and Duane for getting us out of a bind!

 

Current plans are:

(1.) Cement 7” casing at 12,670’ TD,

(2.) ND (“Nipple Down”) 5,000 psi BOP stack,

(3.) NU (“Nipple Up”) 10,000 psi BOP stack and test as per BLM regulations,

(4.) TIH with 6 1/8” bit and BHA,

(5.) Drill out cement, float joint, and 10’ of new hole,

(6.) Conduct FIT (“Formation Integrity Test”),

(7.) Drill 6 1/8” hole to 15,600’ TVD !!

 

Today’s video features Mr. Trey Franklin, Derrick Man for Rig 88. Trey has been working on drilling rigs in both the domestic US and internationally for the past 18 years.

Derrick Hands is responsible for the upkeep and treatment of the mud system. In the video, Mr. Franklin regularly checks the viscosity and weight of the mud being pumped downhole (going in) and then likewise, checks the same properties of the mud coming out of the hole over the shale shakers. In the video, the viscosity is measured in seconds of time, the number of seconds it takes for 1 quart of mud to fill the cup. Trey then weighs the mud on the scale, reading the weight in pounds per gallon, then enters the readings into the system for permanent record. He spends most of his time talking and conferring with the driller and the mud engineer to ensure the mud system on the surface and downhole meets or exceeds company specifications. A good mud system is vital to the success of the drilling operations. It’s just like the blood in the human body. If your blood is in good shape, you will be in good shape. If your blood is in bad shape, all kinds of sickness and illness will occur. Derrick's hands are also responsible for the maintenance and operation of the two large mud pumps. In the video, you can see Trey using an “old school” method ( a large open-end/box-end wrench) to detect any abnormal sounds or mechanical defects in the fluid ends of the pumps. Pretty ingenious in my book!!

 

Enjoy!

 

2024 11 15   https://vimeo.com/1029268336/44c3856374?share=copy

2024 11 15 Profiles of Courage - Trey Franklin (Derrick Man)







___________

Hello Everyone!

 

This morning, Thursday, November 14, 2024, 6:00 am MST, we are RIH with 7” intermediate casing at 8,050’.

 

Current plans are:

 

(2.) Finish RIH with 7” casing to 12,670’ TD and cement.

(3.) ND (“Nipple Down”) 5,000 psi BOP stack,

(4.) NU (“Nipple Up”) 10,000 psi BOP stack and test as per BLM regulations,

(5.) TIH with 6 1/8” bit and BHA,

(6.) Drill out cement, float joint, and 10’ of new hole,

(7.) Conduct FIT (“Formation Integrity Test”),

(8.) Drill 6 1/8” hole to 15,600’ TVD !!

 

Today’s video features Mr. Nathan Wagner, Field Supervisor with TRK Casing Services.

Mr. Wagner explains the casing running process in general.

TRK personnel clean the threads of the casing, makeup each joint, and then run it in hole.

This process is repeated for each of the 324 joints of the casing.

It will take approximately 14 hours to run the entire 12,670’ casing string.

 

Enjoy!

 

2024 11 14   https://vimeo.com/1029681988/f9dffb0d35?share=copy

2024 11 14 Running 7” Intermediate Casing





_____________


Hello Everyone!

 

This morning, Wednesday, November 13, 2024, 6:00 am MST, we are POOH with the bit, preparing to RIH with 7” intermediate casing.  

We finished logging and RIH with the bit, tagged the bridge at 7,870’ (TD of hole is at 12,670’).

Washed and reamed the hole at same, then TIH to 12,670’ TD.

After circulating and conditioning the mud for several hours, we are currently POOH preparing to run casing.  

 

Current plans are:

 

(1.) POOH with bit.

(2.) Run and cement 7” casing at 12,670’ MD,

(3.) ND (“Nipple Down”) 5,000 psi BOP stack,

(4.) NU (“Nipple Up”) 10,000 psi BOP stack and test as per BLM regulations,

(5.) TIH with 6 1/8” bit and BHA,

(6.) Drill out cement, float joint, and 10’ of new hole,

(7.) Conduct FIT (“Formation Integrity Test”),

(8.) Drill 6 1/8” hole to 15,600’ TVD !!

 

Today’s video features Mr. Ben Hadden (LSOG Wellsite Supervisor & Drilling Engineer). Ben explains the open hole logging process a bit more in detail.

Thank you, Jacek, for staying up until the wee hours of the morning to video and document the logging process!

 

 

2024 11 13   https://vimeo.com/1029273650/42e877f99e?share=copy

2024 11 13 Intermediate Logging Depth 12670' Ben Hadden




Tuesday, November 12, 2024

2024 11 12 Profiles of Courage - Joshua Mitchell (Mudlogger)

2024 11 12 Profiles of Courage - Joshua Mitchell (Mudlogger)

 This morning, Tuesday, November 12, 2024, 6:00 am MST, we are running open hole logs (Schlumberger). We finished POOH, rigged up logging truck and logging tools, ran in the hole, and tagged a bridge at 7,870’ (TD of hole is at 12,670’). We are currently logging up from there to surface casing set at 3,500’. Tagging bridges up high on initial logging runs are nothing unusual or out of the ordinary. Normal procedures are to make another bit trip to bottom, wipe and ream the hole at the tight spot, then attempt to run logs again, however; since winter stipulations are fast approaching, it is imperative we continue with drilling operations to reach the Shannon 5 at 15,600’.

 

Current plans are:

 

(1.) finish logging to surface casing at 3,500’,

(2.) TIH with bit to 12,670’,

(3.) Circulate & condition mud. POOH.

(3.) Run and cement 7” casing at 12,670’ MD,

(4.) ND (“Nipple Down”) 5,000 psi BOP stack,

(5.) NU (“Nipple Up”) 10,000 psi BOP stack and test as per BLM regulations,

(6.) TIH with 6 1/8” bit and BHA,

(7.) Drill out cement, float joint and 10’ of new hole,

(8.) Conduct FIT (“Formation Integrity Test”),

(9.) Drill 6 1/8” hole to 15,600’ TVD !!

 

Today’s video features Mr. Joshua Mitchell (Mudlogger). Josh is one of the newest members of the LSOG team here on location. He works the nighttime shift from 6:00 PM to 6:00 AM, relieving Dr. Mike Seidensticker who works the daylight shift. Mudloggers collect and analyze the cuttings from the hole to determine the geology of where we are at throughout the drilling of the well. There are a myriad of different technical analyses run on the cuttings. In the video, Josh explains the details of some of those technical evaluation processes.



 

2024 11 12   https://vimeo.com/1028672290/c25eda3024?share=copy

2024 11 12 Profiles of Courage - Joshua Mitchell (Mudlogger)


California Is Coming for Your Tires | with Marc Morano

California Is Coming for Your Tires | with Marc Morano   The Steve Gruber Show – Broadcast August 19, 2019 Steve welcomes ClimateDepot.com p...