Join the room, call it "AJ Daily"

Join like a ZOOM MEETING 🖥 😎 AJ Daily @ noontime PST

We can even talk about "Big Oil and Gas Development"

Big Oil and Gas 24: 2024 11 18 Rigging Up Annular Preventer - Duane Winkler (LSOG Wellsite Supervisor)

About Me

My photo
When discussing the future of the oil and gas industry beyond 2024, it is important to consider the unscientific use of the propaganda term "pollutant" when referring to CO2 gas. While people often label CO2 as a "Greenhouse Gas", it's important to remember that CO2 is necessary for all plant life, and mammals exhale CO2 as a natural part of their bodily functions. Therefore, labeling CO2 as a pollutant is wrong. Do Not Comply if necessary, California government officials could be informed of these facts.



Followers

CO2?

When discussing the future of the oil and gas industry beyond 2024, it is important to consider the unscientific use of the propaganda term "pollutant" when referring to CO2 gas. While people often label CO2 as a "Greenhouse Gas", it's important to remember that CO2 is necessary for all plant life, and mammals exhale CO2 as a natural bodily function. Therefore, labeling CO2 as a pollutant is wrong. Do Not Comply if necessary, California government officials should be informed of these facts.

Oil Patch 2024

Oil Patch 2024
Oil Patch 2024

Oil Patch Nov 13, 2024

Oil Patch Nov 13, 2024
Rig 88 Nov 13, 2024

Monday, November 18, 2024

2024 11 18 Rigging Up Annular Preventer - Duane Winkler (LSOG Wellsite Supervisor)

2024 11 18 Rigging Up Annular Preventer - Duane Winkler (LSOG Wellsite Supervisor)

 This morning, Monday, November 18, 2024, 6:00 am MST, we are drilling 40 fph at 12,940’. Made 270’ yesterday. Finished TIH with 6 1/8” bit and BHA.

Drilled out float joints and 10’ of new hole. Conducted a FIT (“Formation Integrity Test”) . Tested casing seat to 14.5 ppg. Currently drilling @ 12,940’!

 

Current plans are:

(1.) Drill 6 1/8” hole to 15,600’ TVD (15,800’ MD)!!

 

Today’s video features Mr. Duane Winkler, one of our Wellsite Supervisors, discussing the surface well control equipment currently being utilized on the Found Soldier Federal #1.

On numerous reports you see the acronym “BOP” or “BOPE”, which stands for Blowout Preventer.

This usually refers to the entire BOP stack, which will become more clear in the video.

 

Have also attached another still picture by Jacek entitled “Moonrise on Rig 88”.

 

Enjoy!

 

2024 11 18   https://vimeo.com/1030798279/6ab0fdf494?share=copy

2024 11 18 Rigging Up Annular Preventer - Duane Winkler (LSOG Wellsite Supervisor)


No comments:

Post a Comment

2024 12 11 Rig 88 Rig Down Move Out

2024 12 11 Rig 88 Rig Down Move Out  = R.D.M.O. On Wednesday, December 11, 2024, at 7:52 AM, Denny Migl wrote: Hello Everyone! Today is Wedn...