Join the room, call it "AJ Daily"

Join like a ZOOM MEETING 🖥 😎 AJ Daily @ noontime PST

We can even talk about "Big Oil and Gas Development"

Big Oil and Gas 24: 2024 12 02 Dr. Mike Seidensticker Mud Log Summary

About Me

My photo
When discussing the future of the oil and gas industry beyond 2024, it is important to consider the unscientific use of the propaganda term "pollutant" when referring to CO2 gas. While people often label CO2 as a "Greenhouse Gas", it's important to remember that CO2 is necessary for all plant life, and mammals exhale CO2 as a natural part of their bodily functions. Therefore, labeling CO2 as a pollutant is wrong. Do Not Comply if necessary, California government officials could be informed of these facts.



Followers

CO2?

When discussing the future of the oil and gas industry beyond 2024, it is important to consider the unscientific use of the propaganda term "pollutant" when referring to CO2 gas. While people often label CO2 as a "Greenhouse Gas", it's important to remember that CO2 is necessary for all plant life, and mammals exhale CO2 as a natural bodily function. Therefore, labeling CO2 as a pollutant is wrong. Do Not Comply if necessary, California government officials should be informed of these facts.

Oil Patch 2024

Oil Patch 2024
Oil Patch 2024

Oil Patch Nov 13, 2024

Oil Patch Nov 13, 2024
Rig 88 Nov 13, 2024

Monday, December 2, 2024

2024 12 02 Dr. Mike Seidensticker Mud Log Summary

2024 12 02 Dr. Mike Seidensticker Mud Log Summary

Good Morning Everyone! Good news you can trust!

 

Today is Monday, December 2, 2024, 6:00 am MST. At report time, we are currently TIH with Schlumberger logging tools (Run #1).
Yesterday we finished TIH with bit and reamer to TD at 15,712 MD TD. Circulate and Conditioned mud.
POOH. RU Schlumberger logging truck. Start TIH with Schlumberger logging tools (Run #1 of 4).
Will be logging most of the day.

More to follow……….

Current plans are:
  1. Finish running open hole logs
  2. TIH with bit & drill pipe
  3. Circulate and condition mud to run 4½” casing.
  4. POOH LDDP (“Pull Out Of Hole   Lay Down Drill Pipeline")
  5. Run 4½” production casing
  6. Cement
  7. RDMO Rig 88 to Jeffrey City yard.

Estimated 8 to 10 days remaining on location.


Today’s video topic focuses on a mudlogging summary by Dr Mike Seidensticker, lead mudlogger, who has been on location since Day 1.








Also attached is another sunset picture Rig 88.



 

2024 12 02   https://vimeo.com/1035001849/14bdcefebc?share=copy

2024 12 02 Dr. Mike Seidensticker Mud Log Summary



No comments:

Post a Comment

2024 12 11 Rig 88 Rig Down Move Out

2024 12 11 Rig 88 Rig Down Move Out  = R.D.M.O. On Wednesday, December 11, 2024, at 7:52 AM, Denny Migl wrote: Hello Everyone! Today is Wedn...